Maintenance Work Plan Progress - 3d

This measure tracks how much of the planned maintenance operation work in the Statewide Transportation Improvement Program and some additional activities, are accomplished each year.

Embed
Is Responsive
Embed Code

Write Up:

This measure tracks how much of the planned maintenance operation work in the Statewide Transportation Improvement Program, and additional activities, is accomplished each year. The measure includes location-specific work such as bridge deck seals and comprehensive statewide work, such as striping. Location-specific work is tracked in the MoDOT Management System and reports updates in year-to-date status.  

 

The MoDOT Management System continues to improve the accuracy of planning and documenting accomplishments at MoDOT. In the spring of this year, planned work was impacted by numerous unplanned and visual work activities such as litter pick up, sign replacement and roadsides. Several MoDOT districts initially shifted roadway work to align with fiscal year 2024 funding. The majority of roadway activities began in late May to early June 2023. 

 

The example visual above from MMS demonstrates work plan progress for Asphalt Pavement Repair and Pipe Culvert Repair for calendar year 2023.  

Purpose of the Measure:

MoDOT publishes the maintenance and operations work plans every year in the STIP for the first three years. This measure is done to determine how each district performs compared to the planned levels in the STIP and the assumed 90% of lane miles as the target for mowing shoulder miles.

Measurement and Data Collection:

Activities planned in the STIP and other activities such as striping and mowing are tracked in MMS. Planned amounts are also developed in MMS and are used for determining the percent of work plan progress. One exception is the mowing, total shoulder miles are estimated at 90% of the lane miles for this measure.

Results Driver

Contact Photo
Brandi Baldwin
Brandi Baldwin
Title
State Construction and Materials Engineer
Department
Construction and Materials
Contact Info

Email: Brandi.Baldwin@modot.mo.gov 

Phone: (573) 751-7455

Measurement Driver

Contact Photo
mike photo
Michael Middleton
Title
Project Director
Department
Maintenance
Contact Info

Email: Michael.Middleton@modot.mo.gov 

Phone: (573) - 508-7952